Manchester Road Renewal Projects

As Brentwood looks forward to its second century, we're working on ambitious plans.

In January 2017, the City of Brentwood commissioned a team of consultants to evaluate and recommend a comprehensive citywide development plan to renew the Manchester Road corridor. In May 2017, the Board of Aldermen approved three projects for implementation.

Manchester Road Renewal Projects Overview (PDF)

These projects are designed to ensure and enhance the City of Brentwood's vibrancy for many years to come.

Deer Creek Flood Mitigation Project

The Deer Creek Flood Mitigation Project involves the planning, design and construction of improvements to the Deer Creek Channel. This project aims to alleviate ongoing flooding problems located along Deer Creek and work to protect affected properties from the 100-year flood plain and more frequent flooding.

Postcard for Residents - July 2018 (PDF)

Flood Mitigation Studies

Deer Creek Flood Mitigation - March 2017 (PDF)

Deer Creek to Rogers Parkway Study - April 2016 (PDF)

City of Brentwood Flood Risk Management Analysis - September 2014 (PDF)

Preliminary Flood Mitigation Study for Deer Creek in Brentwood - August 2013 (PDF)

Manchester Road Improvement Project

The Manchester Road Improvements Project is a Missouri Department of Transportation (MoDOT) project focusing on pedestrian and vehicular improvements to Manchester Road within the city limits of Brentwood. This 1.5-mile project, anticipated to begin in 2020, will consist of a mill and overlay of the existing asphalt pavement; replacement of the existing concrete gutter with curb and gutter; partial access management of existing business entrances; and pedestrian improvements to sidewalks, pedestrian signals and pedestrian crossings. In conjunction with the MoDOT project, the City of Brentwood will implement additional improvements to the overall appearance of Manchester Road, a vital commercial corridor.

MoDOT Manchester Road Resurfacing Project

Manchester Road Corridor Brochure (PDF)

Deer Creek Greenway Connector Project

The Deer Creek Greenway Connector Project involves planning, design and construction of a connection between the City of Brentwood’s Rogers Parkway and the Great Rivers Greenway’s (GRG) Deer Creek Greenway. In partnership with GRG, the City of Brentwood aspires to connect its residents to the surrounding larger community, while at the same time sharing Brentwood’s wonderful parks and open space amenities with the region.

RESOURCES AND PROJECT UPDATES

June 18, 2018 Board of Aldermen Meeting

Ordinance 4845 (PDF) - Brentwood Redevelopment Corporation/Chapter 353 Development Plan

Video Clip from June 18, 2018 Board of Aldermen Meeting

July 16, 2018 Board of Aldermen Meeting

Ordinance 4847 (PDF) - Moratorium of up to six months on development or change of use of property located within eastern portion of Manchester Road Sub-Area Plan

September 4, 2018 Board of Aldermen Meeting

Presentation: Project Update and Next Steps

September 10, 2018 Community Engagement Task Force Meeting

Project Overview Presentation