[ARCHIVED] MSD Project Clear Update – September 10, 2020

MSD Project Clear Update

Work anticipated in the next three weeks on Metropolitan St. Louis Sewer District’s Project Clear in Brentwood:

  • Deer Creek Sanitary Tunnel – The contractor has completed setting up the site to accept delivery of the ready-mix concrete that will be used to line the Deer Creek Tunnel. Concrete deliveries began at this site on June 9 and will continue through late September.
  • Deer Creek Sanitary Tunnel – The contractor completed the drill and blast excavation of the tunnel from the shaft located near Breckenridge Industrial Court and Manchester Road. The contractor has prepared this tunnel for installation of the fiberglass sewer pipe. Pipe is being stored on the former Midwest Floor site, within a temporarily fenced area, and pipe installation will be performed through the end of September. The contractor will begin installing the sheet pile excavation support system for the Diversion Structure at this site later in September.

Learn more about Project Clear: https://bit.ly/2zcZyaa

Facebook Twitter Email

Other News in Home

Brentwood Bulletin Fall 2020

Brentwood Bulletin - Fall 2020

Posted on: October 22, 2020
Just the Facts - Prop. 1

Prop. 1 - Brentwood's Use Tax Proposal

Posted on: September 20, 2020
COVID-19 Updates

City of Brentwood COVID-19 Updates

Posted on: September 15, 2020
COVID 19 Resources

COVID-19 Resources

Posted on: September 15, 2020
Message from Mayor Dimmitt

Message from the Mayor

Posted on: July 23, 2020