Construction work anticipated in the next two weeks on the Brentwood Bound Plan:

Flood Mitigation Phase 1

      • L. Keeley is working on the new Executive Walk Apartments entrance at Brazeau. They are planning on working on the following activities in this area:
        1. Installation of the new Dumpster enclosure
        2. New sidewalk installation
        3. Sealing and striping of the parking lot
        4. New sign installation
      • L. Keeley is working on the mass grading along Brentwood Industrial Court, removing the overburden from above the location of the new 72” sewer pipe.
      • L. Keeley is installing the temporary gravel roadway for the new intersection of Brentwood Industrial Drive at Breckenridge Industrial Court.

Site Cameras

See a live view of work on Brentwood Bound through the “Site Cameras” link on the top of the home page of www.BrentwoodBound.org.  

Facebook Twitter Email

Other News in Brentwood Bound

Brentwood Bound Video

Brentwood Bound Overview

Posted on: October 10, 2019
Brentwood Bound Watershed

Brentwood Bound Quick Overview

Posted on: October 10, 2019