News Flash Home
The original item was published from 3/16/2020 1:21:08 PM to 3/25/2020 12:00:02 AM.

News Flash

Home

Posted on: March 16, 2020

[ARCHIVED] MSD Project Clear Update – March 16, 2020

MSD Project Clear Update

Work anticipated in the next three weeks on Metropolitan St. Louis Sewer District’s Project Clear in Brentwood:

  • DC-02 & DC-03 Relief Sewer Phase 2: Restoration work is ongoing in Brentwood Park. The completion of asphalt paving work on Bremerton is weather dependent and will be performed this Spring.
  • Deer Creek Sanitary Tunnel – The contractor has interrupted their work excavating a shaft from the surface down to the tunnel at the site near Brazeau and Suburban Tracks to focus on removing equipment from the main tunnel. The shaft excavation through the rock, which is being performed using drill and blast methods, is scheduled to resume in late March.
  • Deer Creek Sanitary Tunnel – The contractor has resumed the drill and blast excavation of the tunnel from the shaft located near Breckenridge Industrial Court and Manchester Road. This tunnel excavation will continue for several months.

Learn more about Project Clear: https://bit.ly/2zcZyaa

Learn more about Project Clear
Facebook Twitter Email

Other News in Home

Paper Shred Day 2.4.2023

Residential Paper Shredding: February 4

Posted on: February 1, 2023
Cold Weather Resources

Cold Weather Reminders and Resources

Posted on: December 22, 2022
Connect With Brentwood

Connect with the City of Brentwood

Posted on: February 1, 2023
Brentwood Bulletin Winter 2023

Brentwood Bulletin - Winter 2023

Posted on: January 4, 2023
Subscribe to Enews

Sign Up for Brentwood’s E-Newsletter

Posted on: September 22, 2022
Message from Mayor Dimmitt

A Message from Mayor Dimmitt

Posted on: November 28, 2022
Use Tax Notice

Use Tax

Posted on: November 9, 2021