[ARCHIVED] MSD Project Clear Update – April 9, 2020

MSD Project Clear Update

Work anticipated in the next three weeks on Metropolitan St. Louis Sewer District’s Project Clear in Brentwood:

  • DC-02 & DC-03 Relief Sewer Phase 2: Sod is being installed in Brentwood Park. The completion of asphalt paving work on Bremerton is weather dependent and will be performed this spring. More details regarding the sequence of paving work will be provided once the schedule has been confirmed with the subcontractor performing this work.
  • Deer Creek Sanitary Tunnel – The contractor has resumed work excavating a shaft from the surface down to the tunnel at the site near Brazeau and Suburban Tracks. The shaft excavation and excavation of a small diameter chamber from the shaft that connects to the main tunnel is being performed using drill and blast methods. The contractor anticipates completing the drill and blast excavation by April 10. They will temporarily halt work at this site to focus their efforts on other areas of the tunnel.
  • Deer Creek Sanitary Tunnel – The contractor has resumed the drill and blast excavation of the tunnel from the shaft located near Breckenridge Industrial Court and Manchester Road. This tunnel excavation will continue for several months.