Work anticipated in the next three weeks on Metropolitan St. Louis Sewer District’s Project Clear in Brentwood:
- Deer Creek Sanitary Tunnel – The contractor will continue construction of the deaeration chamber at the site at the corner of Brazeau and Suburban Tracks. This structure is located underground at the tunnel elevation, but the workers, equipment, and materials used to construct the structure will be lowered into the tunnel from a crane at the surface. Some piping and reinforcing steel for this structure will be delivered to the site next week.
- Deer Creek Sanitary Tunnel – The contractor continues construction of the Diversion Structure and the Metering Manhole within the sheet pile excavation support systems previously installed at the site located near Manchester and Breckenridge Industrial. The contractor will also begin construction of the deaeration chamber within the previously excavated tunnel shaft at the site.
Learn more about Project Clear: https://bit.ly/2zcZyaa