Work anticipated in the next three weeks on Metropolitan St. Louis Sewer District’s Project Clear in Brentwood:

    • Deer Creek Sanitary Tunnel – The contractor will continue construction of the deaeration chamber at the site at the corner of Brazeau and Suburban Tracks. This structure is located underground at the tunnel elevation, but the workers, equipment, and materials used to construct the structure will be lowered into the tunnel from a crane at the surface. 
    • Deer Creek Sanitary Tunnel – The contractor continues construction of the Diversion Structure within the sheet pile excavation support system previously installed at the site located near Manchester and Breckenridge Industrial. The contractor will continue construction of the deaeration chamber within the previously excavated tunnel shaft at the site.       

Learn more about Project Clear: https://bit.ly/37XeLOo

Facebook Twitter Email

Other News in Home

Prop M 2023 disclaimer

Proposition M on the April 4 Ballot

Posted on: February 22, 2023
Message from City

Message from the City of Brentwood

Posted on: March 7, 2023
Brentwood Bulletin Spring 2023

Brentwood Bulletin - Spring 2023

Posted on: January 4, 2023
Connect With Brentwood

Connect with the City of Brentwood

Posted on: February 1, 2023
Subscribe to Enews

Sign Up for Brentwood’s E-Newsletter

Posted on: September 22, 2022
Message from Mayor

A Message from Mayor Dimmitt

Posted on: November 28, 2022
Use Tax Notice

Use Tax

Posted on: November 9, 2021