Work anticipated in the next three weeks on Metropolitan St. Louis Sewer District’s Project Clear in Brentwood:
- Deer Creek Sanitary Tunnel - Brazeau and Suburban Tracks Site – The contractor will continue installing the riser pipes from the deaeration chamber until they reach the elevation of the approach channel, which is closer to the surface. The contractor will excavate to the top of the rock surface for installation of the approach channel. They will then begin drilling the existing rock surface to make it easier to excavate and then use a hydraulic breaker to excavate the rock.
- Deer Creek Sanitary Tunnel – Manchester and Breckenridge Industrial Site – The contractor completed construction of the concrete portion of the Diversion Structure. The contractor will continue constructing the approach channel that connects the Diversion Structure to the pipes that drop flow into the tunnel.
Learn more about Project Clear: https://bit.ly/37XeLOo