Work anticipated in the next three weeks on Metropolitan St. Louis Sewer District’s Project Clear in Brentwood:
- Deer Creek Sanitary Tunnel - Brazeau and Suburban Tracks Site – The contractor will continue to use a hydraulic breaker to excavate the rock at the site in order to install the 60” sewer pipe and the approach channel.
- Deer Creek Sanitary Tunnel – Manchester and Breckenridge Industrial Site – The contractor will continue constructing the approach channel that connects the Diversion Structure to the pipes that drop flow into the tunnel. They will also begin to backfill the excavations as the approach channel nears completion.
Learn more about Project Clear: https://bit.ly/37XeLOo