Work anticipated in the next three weeks on Metropolitan St. Louis Sewer District’s Project Clear in Brentwood:

    • Deer Creek Sanitary Tunnel - Brazeau and Suburban Tracks Site – The contractor will continue to use a hydraulic breaker to excavate the rock at the site in order to install the 60” sewer pipe and the approach channel. Pipe installation may begin during the three-week period.   
    • Deer Creek Sanitary Tunnel – Manchester and Breckenridge Industrial Site – The contractor will backfill the excavations and begin removing the excavation support system. Some sitework will be performed, including installation of the electrical ductbank.        