Work anticipated in the next three weeks on Metropolitan St. Louis Sewer District’s Project Clear in Brentwood:
- Deer Creek Sanitary Tunnel - Brazeau and Suburban Tracks Site – The 60” pipe installation will begin within the next three weeks followed by construction of the concrete approach channel.
- Deer Creek Sanitary Tunnel – Manchester and Breckenridge Industrial Site – The contractor will begin installation of the electrical ductbank. This will be followed by grading the site and installing the aggregate base beneath the future concrete pavement.
Learn more about Project Clear: https://bit.ly/37XeLOo