Construction work anticipated in the next two weeks on the Brentwood Bound Plan:

Flood Mitigation Phase 1

  • L. Keeley 36” sanitary sewer installation near Mary Avenue and adjustment of sewer structures.
  • L. Keeley mass excavation of the creek bank.
  • L. Keeley excavated soils export.
  • L. Keeley earthwork filling for the playground area.
  • L. Keeley partial creek restoration.

Flood Mitigation Phase 2

  • L. Keeley 72” sanitary sewer installation.
  • G&S waterline bore beneath Deer Creek near Breckenridge Industrial Ct. (on behalf of Missouri American Water).
  • Ameren tree trimming for upcoming overhead powerline relocation.
  • Ameren overhead power relocation.

Deer Creek Greenway Connector Part A

  • Ideal Landscaping sewer and water disconnects at 2948|2950 S. Brentwood Blvd.
  • Ideal Landscaping demo permitting for 2948 S. Brentwood Blvd.
  • Ideal Landscaping storm sewer installation.
  • Ideal Landscaping retaining wall installation. 

Event Lawn/Comfort Station

  • HOF timber frame erecting.