Brentwood Bound Construction Update

On-site construction work details anticipated in the next two weeks on the Brentwood Bound projects:

Flood Mitigation Phase 1

  • Walking trail installation
  • Pond liner installation
  • Landscaping improvements 
  • Remaining sheet pile wall installation near Exchange Way (tentative start)

Flood Mitigation Phase 2

  • Pipe-in-tunnel installation beneath Manchester Road
  • Breckenridge Industrial Court bridge construction
  • Sanitary sewer junction chamber excavation, shoring and construction
  • Sanitary sewer piping installation
  • Sheet pile wall installation east of BauserHaus and Breckenridge Material Co. (tentative start)

Deer Creek Greenway Connector Part A

  • Flatwork and roadway installation
  • Site electrical rough-in
  • Permeable paver parking lot construction (tentative start)
  • Trail paving (tentative start)

Event Lawn/Comfort Station 

  • Installing exterior stone on west side
  • Installing solar panels
  • Installing facility storage garage door
  • Installing electrical wiring and in-slab/ground light conduit and base
  • Final grading for exterior concrete

MoDOT Manchester Road Improvements

  • Sawcutting, removals, and linear grading
  • Form and pour sidewalks, curb ramps, curbs, gutters, and approaches 
  • Deep sanitary sewer installation and storm sewer improvements
  • Light pole installation
  • Pedestrian underpass construction
  • Manchester Road closures near Hanley Road
  • Black Creek bridge construction

Site Cameras

See a live view of work on Brentwood Bound through the “Site Cameras” link at the top of the home page of www.BrentwoodBound.org.  

Learn more about Brentwood Bound at www.BrentwoodBound.org.