On-site construction work details anticipated in the next two weeks on the Brentwood Bound projects:
On-site construction work details anticipated in the next two weeks on the Brentwood Bound projects:
Flood Mitigation Phase 1
- Multi-use trail installation (tentative)
- Irrigation water line installation (tentative)
- Landscaping improvements (tentative)
- Pond liner installation
- Installation of the revetment scour mat at Pond
Flood Mitigation Phase 2
- Breckenridge Industrial Court bridge construction
- Sanitary sewer junction chamber excavation, shoring and construction
- Sanitary sewer piping and structure(s) installation
- Sheet pile wall installation along Black Creek
Deer Creek Greenway Connector Part A
- Roadway and remaining flatwork installation
- Multi-use trail installation
- Utilities installation
- Demo, fill and improvements at 8702 Manchester parking lot
- Completion of the permeable paver parking lot
- Amphitheater retaining wall installation
Event Lawn/Comfort Station
- Final painting in all areas
- Installation of exterior wall insulation and wood siding
- Completion of mechanical and electrical trim in all areas
- Grinding of concrete floors
- Completion of food truck plaza concrete paving
MoDOT Manchester Road Improvements
- Demo, removals and utility work
- Flatwork installation(s)
- Demolition and construction for pedestrian underpass
- South traffic stage change for pedestrian underpass (switchover on 9/6)
- Manchester Road closure(s) and intersection work at Hanley Road
- Black Creek bridge construction
Site Cameras
See a live view of work on Brentwood Bound through the “Site Cameras” link at the top of the home page of www.BrentwoodBound.org.
Learn more about Brentwood Bound at www.BrentwoodBound.org.
Site Cameras
See a live view of work on Brentwood Bound through the “Site Cameras” link at the top of the home page of www.BrentwoodBound.org.
Learn more about Brentwood Bound at www.BrentwoodBound.org.